Partial renovation in Munich underground car park

 

Under the leadership of a planning office based in Landshut, parts of the underground car park of the shopping center in Munich, not far north-west of the Theresienwiese, were renovated as part of the general renovation. The topic was floor joint profiles rusted by de-icing salt as well as cracks in the concrete around the metal profile.

In order to improve the challenges mentioned above, the builder “Bayrische Hausbau” chose our system. The FloorBridge® CPS 20/50 joint profile now enables low-vibration driving over and is also 100% rust-free.

Another requirement was to drain off or collect the water brought in by vehicles. This was solved with the FloorBridge® evaporation system.

Partial renovation in Munich underground car park

 

Under the leadership of a planning office based in Landshut, parts of the underground car park of the shopping center in Munich, not far north-west of the Theresienwiese, were renovated as part of the general renovation. The topic was floor joint profiles rusted by de-icing salt as well as cracks in the concrete around the metal profile.

In order to improve the challenges mentioned above, the builder “Bayrische Hausbau” chose our system. The FloorBridge® CPS 20/50 joint profile now enables low-vibration driving over and is also 100% rust-free.

Another requirement was to drain off or collect the water brought in by vehicles. This was solved with the FloorBridge® evaporation system.